Mumbai Metro Line III for UG 05

Project

Detailed Design Package UG 05 of Mumbai Metro Line III underground: Dharavi to mid ventilation shaft, 4 underground Stations, Twin TBM Tunnels 3.9km, NATM Tunnels, Shafts & structures.

Client

J. Kumar Infraprojects

Services

Appraisal of Geotechnical, alignment studies, Detailed design services, architectural design, E & M design , drainage & 3 cut & cover stations at Dharavi, BKC, Vidyanagri and 1 NATM Station at Santacruz, TBM tunnel & 2 NATM Tunnels