DMRC – CC127, Dwarka Sec – 25 (ICC Station)

Detail Design Consultancy for underground station at Dwarka Sec-25 known as ICC Station.

Location: Delhi

Project Name: Design & Construction of Twin Box tunnel by cut & cover method and one underground station namely ECC center including Architectural Finishing, water supply, Sanitary Installation & Drainage Works from Chainage 2232.711 to 24765.993 (up line) for extension of Airport Express line from Dwarka Sec – 1 to ECC center at Dwarka Sec-25.

Project Description:
• ICC Station – 2 Lines: 220MLong and 35.9mWide
• Height of wall: 15.53 m.
• Excavation Soil – 1,51,200 Cum.
• Geology: Silty clay soil with water level at base slab level
Authority: Delhi Metro Rail Corporation Ltd.

Construction Cost: INR. 400 Cr.