Completed Metros

DMRC Package – CC-23

Detailed Design Consultancy of all Tunnels by Shield TBM and NTAM and 5 Underground Stations from Hauz Khas (Excluding) to kalka Ji by Cut & Cover & allied Cut & Cover Tunnels for Underground Works under Delhi MRTS Project

Client

FEMC Pratibha Joint Venture.

Services

TBM & NATM Tunnel Design, Geological interpretive Report for TBM & NATM .

Read More

Underground Metro Jaipur (Chandpole to Badichaupar)

Design and Construction of tunnel between Chandpole and Badichaupar and TBM, UG Metro Stations at Choti Chaupar and Badi Chaupar on East West Corridor of Jaipur Metro.

Client

Continental Engineering Corporation

Services

Design of tunnel length -2x1385=2770 m & Two Station Design (Badi Chaupar and Choti Chaupar) & Cut & Cover tunnels of length 378m.

Read More

Bimanbandar Underground Metro Station and Yard Kolkata Airport

Underground Multiple-line – Metro Yard & underground Metro Stations at (Bimanabandar (NSC Bose Airport) & Cut & Cover tunnels in Metro Railway from Noapara to Barasat in Kolkata

Client

Metro Railway Kolkata

Services

Geotechnical and alignment studies, Preparation of tender document, Architecture Drawings, air cooling, Drainage design, Detailed Structural design. For underground Yard (14000 spm), Underground Station & tunnel for two Metro Stations & Fire fighting Design.

DMRC Package CC-04

Detailed Design and Construction of Tunnel by Shield TBM, tunnel Cut& cover, underground Station at Azadpur & Ramps at Mukandpur and Shalimar Bagh for underground works on Mukandpur-Yamuna Vihar Corridor of Delhi.

Client

CEC CICI JV

Services

Re-alignment of TBM drives, Instrumentation and Monitoring, Design of TBM Tunnels, two rescue shafts cross passages, Dewatering analysis

Read More

AHMEDABAD METRO

Alignment review, including station location, Land & TBM Drives for 18 km alignment on underground corridor

Client

MEGA

Services

Alignment review, and station planning for: 3 stations and TBM Drives for 4.0 km alignment from ARC end to APMC Stations & technical services for UG corridors 2A. 11 km long segment.

DMRC Package CC-01 from Central Secretariat to Mandi House

4 EPB drives with aggregate length 4.72 Km, 2 under ground stations & tunneling under built up structures like American center.

Client

Pratibha CRFG joint Venture

Services

Technical Support, Advisory on instrumentation Monitoring & Value Engineering.

DMRC – CC127, Dwarka Sec – 25 (ICC Station)

Design & Construction Of Tunnel And One Underground Station Icc Centre For Extension Of Airport Express Line From Dwarka Sec – 21 To Icc Centre At Dwarka Sec – 25.

Client

YFC PROJECTS PVT. LTD

Services

Detailed design of the underground station 220m long at ICC Centre by Cut & Cover method for all Temporary and Permanent structures, Entry - Exit and all the associated structures.

In Progress Metros

DMRC DC-04

Detailed Design Consultancy For Elevated Viaduct, PWD Flyover And Underpass Of DMRC Tughlakabad Corridor, Phase – IV Of Delhi MRTS

Client

YFC PROJECTS PRIVATE LIMITED

Services

Metro Viaduct including ramps
Road Underpass Works

Mumbai Metro Line III for UG 05

Detailed Design Package UG 05 of Mumbai Metro Line III underground: Dharavi to mid ventilation shaft, 4 underground Stations, Twin TBM Tunnels 3.9km, NATM Tunnels, Shafts & structures.

Client

J. Kumar Infraprojects

Services

Appraisal of Geotechnical, alignment studies, Detailed design services, architectural design, E & M design , drainage & 3 cut & cover stations at Dharavi, BKC, Vidyanagri and 1 NATM Station at Santacruz, TBM tunnel & 2 NATM Tunnels

PRE BID Metro SERVICES

Metro Project CC-34

4EPB drives with aggregate length 4.36Km, 3 underground Station and cut & cover

Client

Continental Engineering and Construction

Package LKCC06 (Charbagh to KD Babu Stadium)

2 EPB Bored Tunnels Underground Stations at Hussainganj and Hozratganj Cut & Cover Tunnels.

Client

Larsen & Toubro LTD

Copyright © 2017 Indus Consultrans pvt. ltd. All Rights Reserved