Completed Bridges

Detailed Design of 25 Bridges including ROB’s for Railway Siding project of L&T Nabha Power Project at Rajpura

Client

Larsen & Toubro

Katosan Becharaji Gauge Conversion Project

  • Gauge Conversion of Katosan Road – Becharaji (26.6 KM) Metre Gauge to Broad Gauge along with New MSIL BG Siding (Approx. 3 KM) at Becharaji with 25 KV AC Electrification in Ahmedabad Division of Western Railway

Client

Kalpataru Power Transmission Limited

Services

Responsible for carrying survey, Investigation, Preparation, submission & approval (including co-ordination) of Design, drawing required for successful completion of “Gauge Conversion of Katosan – Becharaji (26.6 KM) meter Gauge to Broad Gauge along with New MSIL BG Siding (approx. 3KM) at Becharaji”

Detailed Design & Drawings of Foundation, Substructure, Superstructure, protection Works etc. for 23 Major Bridges and 80 RUB/Subways including Structure, under Track, Retaining Walls, Roof Truss covering, Road Pavement etc.

  • Detail Design Consultancy for 23 Major Bridges

Client

Rail Vikas Nigam Limited

Detailed Design of 2 Riffle Range Bridge 30m Span Composite

Client

PWD Delhi

Bid Design of Railway Bridge across Anji Khad : Large Steel Truss Arch 265 m span

Client

VK Sood- Ramky – Fedder Llyod for Koknan Railway.

Bid Design of Railway track and yard facilities at Marahora and Madhepur for Railway Production facilities

Client

Larsen & Toubro

In Progress Bridges

Detailed Design of Three Minor Highway bridges on Amarvati – Chikli section of NH06 in Maharashtra

Client

IL&FS Transportation Networks Limited.

Transaction Advisory Services for SEC railway for EPC contract Bilaspur- Raigarh 4th Line

Client

Ernest & Young for SEC Railway.

Copyright © 2017 Indus Consultrans pvt. ltd. All Rights Reserved