11Mar

Raipur –Vishakhapatnam Corridor PKG-OD7

Project Name: Development of Six Lane Baraja Kandili Section of NH-130 CD Road from km 338.500 to km 342.500 under Raipur-Visakhapatnam Economic Corridor in the state of Odisha on Hybrid Annuity Mode.

Location: Odisha

Project Description:
Detailed Design Consultancy for Six Lane 3.420 Km. Long Twin Tube Tunnel along with MEP features.

Authority: National Highways Authority of India

Construction Cost: INR. 759.75 Cr.

Project Highlights:
• Design of Six Twin Tunnel Design using NATM.
• Length of Tunnel (2×3 lane) 3.420 Km. Total Length: 6.840 Km.