8Mar

Ramban to Banihal Tunnel Project PKG-1

Ramban to Banihal Tunnel Project PKG-1

Detailed Design and Site Support Services, Including MEP” for Ramban to Banihal (Package-1) Four Lanning on NH-44 Project, from North Bound to South Bound.

Location: Jammu & Kashmir

Project Name: Construction of Four Lanning of part of Ramban to Banihal Section of NH-1A (Now NH44), from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube tunnels (Package-I) in the UT of Jammu & Kashmir on EPC Mode. PKG -1.

Project Description:
Detailed Design Consultancy for 4.2 Km. Long Twin Tube Tunnel along with MEP features.

Joint Venture: Omikron-Kappa Consulting S.A.-ICPL JV

Authority: National Highways Authority of India

Construction Cost: INR. 1245.96 Cr.

Project Highlights:
• Design of Twin Tunnel Design using NATM.
• Length of North Bound Tunnel 4.235 Km.
• Length of South Bound Tunnel 4.225 Km.

Copyright © 2017 Indus Consultrans pvt. ltd. All Rights Reserved